Civic Centre Resource Library – March 30

Lots is happening at the Civic Centre Resource Library this week. Lighting installation is almost complete. Tiling and paint touch-ups are ongoing throughout the facility. Washroom fixture installation is ongoing as well. Ceiling work is nearing completion with the installation of ceiling tiles. The sliding doors have been installed at the main entrance and miscellaneous work is ongoing.

Front entrance work is ongoing. Sliding doors have been installed.

Adult collection

View of the adult collection area.

teen zone

View of the glass doors to the Teen Zone.

study hall

View of the Study Hall.

door to the 2nd floor balcony

Doors to the 2nd floor balcony.

 

 