Civic Centre Resource Library – March 3

The weather is slowing warming up, construction at the Civic Centre Resource Library is coming along very well. Painting work is ongoing at the main floor. Ceiling work is nearing completion. Ceiling baffles and lighting installation are ongoing in the teen and adult areas. Bench seating is being installed. Tile work is ongoing at the washrooms.

1

Painting work is ongoing at the main floor.

2

Above ceiling work is nearing completion.

3

Ceiling baffles and lighting installation are ongoing in the teen and adult areas.

4

Tile work is ongoing at the washrooms.

5

Bench seating installation in ongoing.

6

Wood paneling work is ongoing above the children's area.

7

Interior light fixtures have arrived on site and installation is ongoing.

 

 