Things are moving quickly at the Civic Centre Library. Here is a quick update on what is happening as of this week.

  • Exterior insulation installation is complete at the south side of the building.
  • Framing and welding at the main entrance is ongoing.
  • Glazing installation continues around the exterior perimeter at the east elevation.
  • Composite panel installation is progressing at the north side and around the Reading Garden.
  • Sidewalks are 50% poured at the north side and curb work is progressing at the east and north sides.
  • Interior steel stud work has progressed in all areas.
  • Drywall installation continues throughout the first and second floors.
Floor pLan

Floor Plan - 1st floor.

Floor Plan 2

Floor Plan - 2nd floor.

View of east elevation.

Sidewalk is 50% poured at the east elevation.

Hardscape work has progressed at the east side.

Steel welding and aluminum welding at the main entrance is ongoing.

Glazing installation is complete at the Reading Garden with the exception of the exits.

View of the second floor patio. Roof work is complete and finish work is to be scheduled.