As of this week, the primary structural steel is almost complete. Installation of secondary steel such as trim edges is ongoing. Connection welding continues. Metal decking over the first floor is in place and has started on the second floor. Mechanical and electrical rough-in has begun. Installation of rain water leaders at the collaboration space is underway. Conduit runs are being installed at the maker space and music room areas.