Things are moving quickly at the Civic Centre Resource Library. Structural steel erection continues. Approximately 95% of the steel is installed. Connections have been tied down and bolted together. Open Web Steel Joists (OWSJ) are being distributed across the beams. Secondary steel framing around the roof edge is being installed.