Renovations for Kleinburg are well underway

Renovations at the Kleinburg Library are well under way.  The library’s collections, as well as its furniture and equipment, were all moved to storage and the builders are on site.  As of this week, the covered concrete steps to the lower level at the front of the library have been removed.  The fire and emergency stairs and the roof ladder on the north side of the building have also been removed. The ceilings have been exposed to allow access to electrical cabling and some work has been done on the floors to provide access to the plumbing.  Finally, a dividing wall at the end of the basement corridor has been removed to make way for a new entrance that will provide access to the lower floor of the library from the exterior on the east side.

Kleinburg

The library’s second floor prior to our turning it over to the construction crew.

Kleinburg

The external stairwell leading to the basement on the west side of the building is gone.

Kleinburg

The fire escape and basement stair covering have been removed from the north side.

Kleinburg

The hallway in the basement now leads all the way to the back of the building.

Kleinburg

The current view from the public service desk.

Kleinburg

The old HVAC system being taken away.