Things are moving along quickly at the Civic Centre Resource Library this week. Workers continue to install composite panels on the east side. Framing work is still ongoing at the main entrance at the south. Glazing installation continues around the exterior perimeter (east and south elevations). Interior steel stud work has progressed in all areas and is ongoing at the second level mezzanine and stairwell areas. Drywall installation continues throughout the first floor along with mudding and taping. Temporary plywood has been installed to enclose the building until exterior glazing and panelling can be completed in January.