Civic Centre Resource Library Update – March 6

Things are moving quickly at the Civic Centre Resource Library. Structural steel erection continues. Approximately 95% of the steel is installed. Connections have been tied down and bolted together. Open Web Steel Joists (OWSJ) are being distributed across the beams. Secondary steel framing around the roof edge is being installed.

roof

Secondary steel framing at the roof is being installed.

OWSJ

The Open Web Steel Joists is being installed.

CCRL

Elevator pit is protected.

CCRL

East elevation steel is in place.

CCRL

Steel work continues at the southeast main entrance.

 